Concrete Floor Repair & Resurfacing in Toronto

Crack injection, slab leveling, spall repair, and full concrete resurfacing for Toronto commercial and industrial facilities. Fix it right before you coat it.

Repair Process

Our 5-step concrete repair process — before any coating.

A coating is only as good as the substrate beneath it. Every ProEpoxy job begins with a thorough concrete assessment and all required repairs.

1

Crack Assessment

We map all cracks, classify them as active (moving) or dormant (stable), and measure width and depth. Active cracks require flexible polyurea injection. Dormant cracks can be filled with rigid epoxy mortar. This step determines the repair scope and drives the fix-price quote.

2

Polyurea Crack Injection

We rout cracks to a consistent width, vacuum clean the void, and inject two-component polyurea under controlled pressure. Polyurea is flexible enough to accommodate minor slab movement, bonds at 100% elongation, and achieves working strength within 15 minutes — allowing same-day continuation of prep work.

3

Spall & Surface Repair

Delaminated areas, spalls, pitting, and pop-outs are chiselled to a sound edge, primed with epoxy bonding agent, and filled with fast-set cementitious or epoxy-modified mortar. All repairs are feathered flush to the surrounding slab surface to ensure a flat substrate for coating.

4

Diamond Grinding & Scarifying

The entire slab surface is diamond-ground or scarified to remove surface laitance, contamination (oil, grease, coatings), and to create a Concrete Surface Profile (CSP) appropriate for the specified coating system. This mechanical preparation is non-negotiable — acid etching is not an acceptable substitute for commercial work.

5

Overlay or Coating Prep

After all repairs are cured and the slab is ground to profile, we perform a final moisture test. If moisture vapour emission exceeds the coating manufacturer's threshold, a vapour mitigation primer is applied before the coating system. The slab is now ready for epoxy, polyaspartic, urethane cement, or polished concrete.

Repair vs Replace

Concrete repair economics for Toronto facilities.

$3–$8
Per Sqft — Concrete Repair
Full concrete repair scope including crack injection, spall fill, and diamond grinding to coating-ready CSP. Fraction of the cost of slab replacement.
$15–$30
Per Sqft — Slab Replacement
Full slab demolition, disposal, forming, pour, and cure for a Toronto commercial or industrial floor. Repair is almost always the correct economic choice.
15–25 yr
Extended Life After Repair + Coating
A properly repaired and epoxy-coated concrete slab extends usable service life by 15–25 years, deferring slab replacement and maximizing facility asset value.
FAQ

Concrete repair questions — answered.

Can you repair a cracked concrete floor before epoxy coating in Toronto?
Yes — and it is essential. Cracks that are not properly repaired before epoxy coating will telegraph through the coating within 6–18 months. We use polyurea crack injection for active or dormant cracks, fast-set cementitious mortar for spalls, and diamond grinding to level high or low spots. All repairs are completed and allowed to cure before any coating work begins.
How long does concrete floor repair take in Toronto?
Most commercial concrete repair projects in Toronto are completed in 1–3 days depending on the scope of damage. Polyurea crack injection cures in minutes. Spall repair mortars achieve full strength in 4–6 hours. Diamond grinding and scarifying is typically a one-day operation for areas up to 5,000 sqft. Full resurfacing overlays require 24–48 hours cure time before coating.
Can you repair a concrete floor without replacing the slab?
In most cases yes. Slab replacement is only necessary when the structural integrity of the concrete is compromised — typically due to subgrade failure, severe rebar corrosion, or alkali-silica reaction. Cosmetic and functional defects including cracks, spalls, delamination, and surface contamination can almost always be repaired without slab replacement at a fraction of the cost. We assess each slab and provide an honest recommendation.
What causes cracks in Toronto commercial concrete floors?
The most common causes of concrete cracking in Toronto's commercial and industrial buildings are: Ontario freeze-thaw cycling that stresses slabs at entry thresholds and exterior-connected zones; shrinkage cracking from inadequate curing during original pour; point-load stress from forklift or heavy equipment traffic; subgrade settlement; and de-icing salt penetration causing rebar corrosion and spalling. We identify the cause during assessment to ensure the repair addresses root factors, not just symptoms.
How much does concrete floor repair cost compared to slab replacement in Toronto?
Concrete repair in Toronto typically costs $3–$8/sqft depending on damage type and extent, compared to $15–$30/sqft for full slab replacement including demolition, disposal, forming, pour, and cure time. Repair is almost always the correct economic choice unless structural integrity is compromised. A properly executed repair followed by an epoxy coating extends the usable life of the existing slab by 15–25 years.

Concrete Floor Repair in Toronto: Why You Must Fix Before You Coat

The single most common cause of epoxy coating failure in Toronto commercial and industrial facilities is inadequate substrate repair before installation. Cracks telegraph, spalls read through, and contaminated surfaces reject adhesion — regardless of how premium the coating material is. Repair is not optional preparation; it is the foundation that determines whether a $50,000 coating investment lasts 2 years or 20.

Types of Concrete Defects and How We Fix Them

Concrete defects in Toronto commercial floors fall into four main categories. Cracks (hairline to structural) are addressed with polyurea injection or routing-and-filling depending on whether they are active or dormant. Spalls and pop-outs — caused by freeze-thaw, alkali-silica reaction, or impact damage — are chiselled clean and filled with high-build epoxy mortar. Surface delamination and laitance are removed by diamond grinding or scarifying. Oil and chemical contamination requires hot-water pressure washing and scarification to depth before any bonding agent can be applied. Each defect type has a specific fix; misidentifying them leads to failed repairs that re-open under the coating.

Ontario Freeze-Thaw Damage in Concrete

Toronto's climate delivers 30–40 freeze-thaw cycles per winter — concentrated at exterior thresholds, loading dock transitions, and vehicle entry points where water infiltrates and then expands inside the slab pore structure. This mechanism accelerates concrete deterioration and is the primary cause of surface spalling and crack growth in GTA commercial and industrial buildings. Repairs in these zones must address not just the visible damage but also waterproofing the repaired area to prevent recurrence. Our repair mortars and primers include crystalline waterproofing components for exposed or threshold applications.

When to Repair vs When to Replace a Concrete Floor in Toronto

The decision to repair or replace hinges on structural integrity. If the slab passes a hammer test (solid ring, no hollow areas), has no evidence of rebar corrosion-induced delamination, and no subgrade washout or settlement, repair is almost always the right choice. Replacement makes economic sense only when more than 30–40% of the slab surface is severely delaminated or hollow, or when differential settlement exceeds 10–15mm across the floor area. We perform a free assessment and give you an honest recommendation. Call (647) 692-2131 to book.

Free Assessment — No Obligation

Cracked or damaged
concrete floor?

We assess your slab, specify the right repair approach, and deliver a fixed-price proposal within 24 hours. Serving commercial and industrial facilities across Toronto and the GTA.