Home About Us
Services
Garage Epoxy Commercial & Industrial Warehouse Epoxy Concrete Polishing Epoxy Repair Metallic Epoxy Basement Epoxy Parking Garage Epoxy Restaurant & Kitchen Retail Epoxy Institutional Epoxy Concrete Repair Condo Epoxy Hotel Epoxy Hangar Epoxy
Floor Coatings
Polyaspartic Coating Polyurea Coating Urethane Cement ESD Anti-Static Epoxy Epoxy Flake System News Contact Us

How to Compare Epoxy Floor Quotes Line by Line

The eight line items that make two epoxy quotes comparable, a red-flag table and the questions to send back in writing.

Quick Answer: Eight Lines Make Two Epoxy Quotes Comparable

Comparing epoxy flooring Toronto quotes is hard because every contractor writes them differently, and the lowest number is often the one with the most missing. If you are weighing bids, start with our epoxy flooring cost Toronto page for the rate context, then use this guide to decode each quote line by line.

Quick answer: a quote you can actually compare states eight things in writing: the surface preparation method, the system and total thickness, the flake coverage if flakes are used, the number and type of topcoats, how joints and cracks are treated, the moisture testing and mitigation allowance, the cure schedule and return-to-service times, and the warranty terms. If one of these is missing, the price is not comparable, because you do not know what you would be buying.

Why Epoxy Quotes Vary So Much

Two quotes for the same floor can differ by a wide margin without either contractor being dishonest. The reason is that "epoxy floor" describes a family of very different jobs. One contractor may price a quick acid etch and a single thin coat, while another prices diamond grinding, a full flake broadcast and two topcoats. Both call it an epoxy floor, and both can be written on one page, but they are not the same product.

That is why per-square-foot rates alone are a poor way to compare. We cover the rate tables in our epoxy flooring cost per square foot guide, and contractor vetting in our contractor checklist, so here we focus on one job: reading the quotes you already have and putting them on the same footing.

Line 1: Surface Preparation Method

Surface preparation is the biggest hidden variable between quotes, because it decides whether the coating bonds, and it is the line that cheap quotes most often shrink. The quote should say how the concrete will be prepared, not just that it will be "prepared".

Diamond grinding is the standard method for professional epoxy: a machine with diamond tooling removes the weak surface layer and opens the pores so the coating can grip. Acid etching, shot blasting and light sanding are other methods, and each leaves a different surface profile. A well-written quote names the method and, ideally, the target profile, which the industry describes with the ICRI concrete surface profile scale. If a quote says nothing about prep, or lists "clean floor", treat it as a red flag and ask in writing.

Line 2: System and Total Thickness

The system is the layers the coating is made of, and the total thickness, measured in mils, tells you how much material goes on the floor. A one-coat clear sealer, a two-coat epoxy and a full flake system with topcoats are all sold as epoxy, but they protect the floor very differently.

Ask each contractor to state the layers in order, such as primer, base coat, broadcast, topcoat, and the approximate total build. If one quote lists a thick, multi-layer system and another a single thin coat, the cheaper one is not a bargain; it is a lighter product. Also check the product line: a quote that names the manufacturer and the product data sheet lets you verify the claims.

Line 3: Flake Coverage

If the floor uses decorative flakes, the quote should state how much of the surface is covered, because partial and full broadcast change both cost and result. In a partial broadcast, flakes are scattered lightly and the base colour shows through. In a full broadcast, flakes are applied to rejection, which means the surface is saturated and the excess is swept away, for a dense, textured finish with better coverage of imperfections.

Full coverage uses more material and labour, so it costs more. Two quotes that both say "flake floor" can describe very different looks and prices if one is partial and the other full. Ask for the coverage in writing, and for a sample board that matches it.

Line 4: Number and Type of Topcoats

The topcoat is the layer that takes the wear, resists chemicals and controls gloss, so the number and type of topcoats matter as much as the base. A quote should say how many topcoats are applied and what chemistry they are.

Common topcoat families include epoxy, aliphatic urethane and polyaspartic. Aliphatic chemistries are designed to resist ultraviolet yellowing, which matters in garages and anywhere sunlight reaches the floor. One topcoat of one type is a lighter specification than two coats of a harder, UV-stable material. If the quote only says "sealer", ask what it is and how many coats.

Line 5: Joint and Crack Treatment

Cracks and joints do not disappear under a coating, and how the contractor treats them decides whether they reappear. A good quote says how cracks will be repaired and what will happen to control joints and expansion joints.

Cracks are typically routed and filled with a suitable repair material before coating. Control joints, which are cut to let concrete move, are usually honoured, meaning the coating is not allowed to bridge them rigidly, or they are filled with a flexible material. A quote that ignores joints and cracks entirely is either assuming a perfect slab or planning to coat over problems that will show through later.

Line 6: Moisture Testing and Mitigation

Moisture coming up through the slab is one of the main causes of epoxy failure, so a professional quote includes testing and an allowance for what to do if the results are high. Without it, the coating can blister or peel months later, and the contractor can claim the problem was outside the scope.

Standard tests include the calcium chloride test, described in ASTM F1869, and in-slab relative humidity probes, described in ASTM F2170. If a test shows high moisture, the fix is usually a moisture-mitigating primer or membrane, which costs extra. A good quote either includes the testing and a mitigation allowance or states clearly that it does not, so you can budget for it.

Line 7: Cure Schedule and Return to Service

The cure schedule tells you how long the floor is out of action, which matters most for a business that cannot stop working. A quote should state when foot traffic, light loads and vehicles are allowed, and how many days the job takes.

Different systems cure at different speeds. Polyaspartic and fast-cure systems can return to service sooner than standard epoxy, and cold weather slows everything. Ask for the schedule in writing, including the number of visits, because a job that needs two visits and a job that needs four are not the same price or the same disruption.

Line 8: Warranty Terms in Writing

A warranty is only as useful as its wording, so the quote should say how long it lasts, what it covers and what voids it. A verbal promise or a generic phrase like "fully guaranteed" tells you nothing.

Look for the length, whether it covers peeling and delamination, whether it covers wear or only defects, what conditions are excluded, such as moisture or impact damage, and who handles claims. Two contractors can offer very different protection under the same word. Get the warranty as a document, not a sentence.

Quote Comparison Table: What to Look For and What Is a Red Flag

Use this table as a checklist when you read each quote. If a quote fails several rows, ask for a revision before you compare prices.

Line itemWhat to look forRed flag
Surface prepDiamond grinding or named method, target profile"Clean and prep", or acid etch only on thick systems
System and thicknessLayers listed in order, approximate total mils, product namedOne vague "coating", no product or thickness
Flake coveragePartial or full broadcast stated, sample provided"Flake floor" with no coverage
TopcoatsNumber and chemistry named, UV stability addressed"Sealer" with no details
Joints and cracksCrack repair method and joint treatment describedNo mention of cracks or joints
MoistureTesting included, mitigation allowance or exclusion statedNo testing, no mention of moisture
Cure scheduleVisits, days and return-to-service times in writing"A few days" with no schedule
WarrantyLength, coverage and exclusions in a documentVerbal or one-line warranty

How to Normalize Three Differently Written Quotes

To compare quotes fairly, rebuild each one on the same sheet with the same eight lines, and mark every blank. This takes about twenty minutes and often reveals why one price is lower.

  1. Make a grid. Put the eight line items down the side and each contractor across the top.
  2. Fill in only what the quote states. Do not assume. If the quote does not mention moisture testing, write "not stated", not "included".
  3. Circle the blanks. Each blank is a question to send back, and each answer may change the price.
  4. Ask the same questions of everyone. Send one written list to all contractors so the revised quotes are comparable.
  5. Adjust for missing scope. If the cheapest quote leaves out grinding, moisture testing and a second topcoat, estimate what those would add before you compare totals.
  6. Compare the finished sheet. Look at what you get for each price, not at the price alone.

If your project is in a garage, our epoxy garage floor Toronto page explains the typical scope, and for larger spaces our commercial epoxy flooring Toronto page covers what changes at scale.

A Worked Example: Reading Two Quotes Side by Side

Here is a made-up example, with no prices, to show how the method works. Quote A is a single paragraph that says "epoxy floor coating, includes prep and sealer" for a two-car garage. Quote B is itemized: diamond grinding, a primer, a base coat, a full flake broadcast, two aliphatic topcoats, crack repair, a moisture test, a two-visit schedule and a written warranty.

When you fill in the grid, Quote A has a blank in almost every row. You do not know the prep method, the thickness, the flake coverage, the topcoat chemistry, the crack treatment, the moisture plan, the schedule or the warranty. Quote B has an answer in every row. If Quote A is lower, you cannot say it is cheaper, because you cannot say what it is. The right move is to send Quote A the eight questions and wait for a revised quote. Often the gap narrows once the missing scope is priced in, and sometimes it does not, which is useful to know too.

The same approach works for commercial jobs, where the stakes are higher because downtime and chemical exposure add cost. A contractor who prices the cure schedule and the joint treatment clearly is showing that they have thought about how your space actually runs.

What a Lowball Quote Usually Leaves Out

A very low quote is rarely a better deal; it is usually a smaller job. The most common omissions are the ones in the table above: real grinding, moisture testing, a second topcoat, crack repair and a written warranty. Each one saves the contractor time and material, and each one raises the chance of a floor that fails early.

That does not mean the highest quote is the right one. It means the useful question is "what is included", not "what is the number". Send the contractor a short email asking the following, and keep the answers:

  • What surface preparation method will you use, and to what profile?
  • What are the layers, the product names and the total thickness?
  • If flakes are used, is the broadcast partial or full?
  • How many topcoats, and are they UV-stable?
  • How will you treat cracks and control joints?
  • Is moisture testing included, and what happens if the result is high?
  • How many visits and days, and when can we walk and drive on it?
  • What does the warranty cover, for how long, and what voids it?

A contractor who answers these clearly, in writing, is usually one worth considering. One who avoids them is telling you something too.

How We Write Our Quotes

We write ProEpoxy quotes with these eight lines so you can compare them directly, with the preparation method, the system, the topcoats, the moisture plan, the schedule and the warranty stated in the document. We would rather you compare us line by line than on the total alone. To request a written quote for your floor, call (647) 692-2131 or use the contact form.

Frequently Asked Questions

Why do epoxy quotes vary so much?
Because epoxy floor describes very different jobs. One quote may be a light prep and a single thin coat, while another includes diamond grinding, a thick multi-layer system, full flake and two topcoats. Differences in preparation, thickness, moisture testing and warranty explain most price gaps, so compare scope before price.
What should an epoxy floor quote include?
A comparable quote states eight things in writing: surface preparation method, system and total thickness, flake coverage if used, number and type of topcoats, crack and joint treatment, moisture testing and mitigation, cure schedule and return-to-service times, and warranty terms. Missing items usually mean missing scope.
Is the cheapest quote always a mistake?
Not always, but it deserves scrutiny. A low price is fine if the scope matches the others. It becomes a problem when it leaves out grinding, moisture testing, a second topcoat or a written warranty. Rebuild each quote on the same eight lines to see what you are really buying.
What is flake coverage percentage?
It describes how much of the floor surface is covered by decorative flakes. A partial broadcast scatters flakes lightly so the base colour shows through, while a full broadcast applies flakes to rejection for a dense finish. Full coverage uses more material and labour, so it affects both cost and appearance.
Should surface prep be itemized separately?
Yes. Surface preparation is the biggest hidden variable between quotes, so the method and, ideally, the target profile should be stated clearly. A line that says only prep or clean floor makes it impossible to compare, because grinding and light cleaning are very different amounts of work.

Compare Us Line by Line

Send us the quotes you have. We will explain the differences and write our estimate with all eight lines stated.

Free Quote - No ObligationToronto & GTA Epoxy Flooring
Call Now Get Quote